J.B. Starkey (STK) and North Pasco Regional (NOP) Wellfields Ecological Monitoring

Project Details Ecological and hydrological data collection and analyses, in accordance with a SWFWMD Water Use Permit (WUP) for the purpose of allowing early detection of potential groundwater withdrawal effects to protect regional water and environmental resources. The purpose of the ecological monitoring and assessment program is to monitor and provide an analysis of the…

SR 70 from DeSoto County Line to Jefferson Avenue (451649-1) PD&E/Design Overlap Project

Project Details The Florida Department of Transportation (FDOT) District One has prioritized improvements to State Road 70, an east-west corridor, through several counties totaling 11-miles. Challenges and Solutions • Statewide prioritization of SR 70 projects – working with OEM on advanced project schedule. • The corridor is located within an area of highly sensitive habitats…

One Water Progressive Design Build Project

Project Details Earth Resources is the Lead Environmental firm on this $1-billion progressive design build project. Hillsborough County’s One Water Program is a comprehensive drinking water, wastewater, and reclaimed water master plan developed to provide reliable, resilient, and sustainable utility services in southern Hillsborough County to meet the region’s unprecedented growth needs. This large-scale Progressive…

FDOT District 1: Environmental Management Office (EMO) Continuing Services Contract

Project Details This contract is a Continuing Services Contract for the Florida Department of Transportation District 1 Environmental Management Office (EMO). The contract is intended to support EMO for various tasks ranging from environmental and engineering analysis, document reviews, in-house project management and environmental project management roles, and public engagement services. Tasks • Project Manager…

Central Polk Parkway East from SR 60 to US 17/92 Alternative Corridor Evaluation Study

Project Details The Florida Department of Transportation (FDOT), Florida’s Turnpike Enterprise (FTE) is conducting an Alternative Corridor Evaluation (ACE) Study for Central Polk Parkway East (CPPE) from SR 60 to US 17/92 in Polk County, Florida. This ACE Study is being conducted to identify, evaluate, eliminate, and recommend project alternatives for the Project Development &…

FDOT D7 GEC Support: Contamination Assessment Support

Project Details Provide NEPA contamination support for FDOT D7, including preparing Level I Contamination Screening Evaluations, managing Level II Assessments and Level III Remedial Action Assessments, preparation of Environmental Documents, providing contamination assessment report reviews, providing impact analysis during scoping, progress, and phase update meetings, assisting with development and negotiation of staff hours for contamination…

Citrus Park Drive Extension Project

Project Details This project involves the construction of a new 2.82-mile roadway that connects two existing segments of Citrus Park Drive. Due to the lack of mitigation banks in the area, a wetland mitigation area was designed, permitted, constructed and monitored. Tasks include: • Mitigation design and permitting • Wetland impact analysis • SWFWMD ERP,…